1. To turn out bolts of 3 fastenings of a reception pipe to the final pipeline.
2. To turn away a nut of bolts of 7 fastenings of neutralizer.
3. To remove a reception pipe and neutralizer.
4. To take out old consolidation 1.
To clear
PERFORMANCE ORDER
Condensed surfaces of a flange and the final pipeline.
To establish or attach
PERFORMANCE ORDER
1. New consolidation 1.
2. A reception pipe and neutralizer.
3. Fixing bolts and neutralizer nuts.
4. Fixing bolts of a reception pipe. To tighten bolts of fastening of a reception pipe to the final pipeline the moment of 20 Nanometers. To tighten nuts and bolts of fastening of neutralizer to a reception pipe the moment of 20 Nanometers.